top of page
Inland-Contractors,-Inc.-logo

Inland Contractors, Inc.

Inland Contractors, Inc.

Trusted asbestos & Lead Abatement since 1997

Trusted asbestos & Lead Abatement since 1997

Big Bear Lake Asbestos Abatement Project Highlight: Safe Removal of Floor Tile, Transite Pipe & Window Glazing

  • Writer: Triston Greenawalt
    Triston Greenawalt
  • Jul 14
  • 3 min read

Project Overview from Big Bear Lake asbestos removal

At Inland Contractors, Inc., every asbestos abatement project is approached with careful planning, regulatory compliance, and a commitment to protecting our clients and the surrounding environment. Recently, our team completed a residential asbestos removal project in Big Bear Lake, California, involving multiple asbestos-containing materials located throughout the home.

This project required the safe removal and proper disposal of transite pipe, asbestos-containing floor tile, and asbestos window glazing before future renovation work could begin.

Whether you're planning a remodel, purchasing an older home, or preparing for demolition, this project highlights why professional asbestos abatement is an essential first step.

Project Highlight of the Full Abatement Scope of a project in Big Bear Lake

Project Scope

Our licensed asbestos abatement team safely removed the following asbestos-containing materials:

✅ Transite Pipe

  • Crawl Space

  • Interior Wall

  • Attic

  • Roof

  • 15 Square Feet

✅ Asbestos Floor Tile

  • Off-White/Brown Floor Tile (No Mastic)

  • Pantry

  • 110 Square Feet

✅ Window Glazing

  • Exterior Wood Windows

  • Windows Completely Removed and Properly Disposed

  • 200 Square Feet

Every material was removed using established asbestos abatement procedures before being packaged, labeled, and prepared for transportation to an approved disposal facility.


A visual of Asbestos Containing Floor Tile, Exterior Window Glazing, and Transite pipe before abatement by Inland Contractors

Why These Materials Can Contain Asbestos

Many homes throughout Big Bear Lake, the San Bernardino Mountains, the Inland Empire, and Southern California were built during decades when asbestos was commonly used because of its strength, durability, and fire-resistant properties.

Some of the most common locations include:

  • Floor tile

  • Window glazing compounds

  • Roofing materials

  • Vent pipes

  • Cement transite pipe

  • Pipe insulation

  • Drywall joint compound

  • Ceiling texture

  • Exterior siding

  • Vinyl flooring

Although these materials may appear harmless, they can become hazardous when disturbed during remodeling, demolition, or renovation.

Existing Conditions Before Abatement

Before any removal work began, asbestos-containing materials remained throughout the property.

The project included:

  • Older pantry floor tile

  • Aging window glazing around exterior wood windows

  • Cement transite pipe extending through the attic and roof

Each material was documented and included within the approved asbestos survey before work began.

Proper planning is critical because disturbing asbestos without containment can release microscopic fibers into the air.

Safe Removal Procedures

Every asbestos abatement project follows strict procedures designed to minimize fiber release and protect both workers and occupants.

For this project our team:

  • Isolated the work areas

  • Utilized appropriate personal protective equipment (PPE)

  • Used wet removal methods where applicable

  • Carefully removed asbestos-containing materials

  • Prevented unnecessary breakage during removal

  • Maintained a clean work environment throughout the project

These procedures help reduce the possibility of airborne asbestos fibers during removal activities.

A look at Inland Contractors proper bagging and disposal of asbestos containing material

Proper Packaging and Disposal

After removal, every asbestos-containing material was prepared for transportation using industry-approved packaging methods.

Materials were:

  • Properly wrapped

  • Sealed in approved asbestos waste bags

  • Labeled appropriately

  • Prepared for transportation

  • Sent to an approved disposal facility

Proper packaging is one of the most important steps of any asbestos abatement project because it helps ensure asbestos-containing waste remains secure during transport and disposal.

Why Professional Asbestos Removal Matters

Many homeowners don't realize asbestos can be present until they begin remodeling.

Attempting to remove suspect materials without proper training may increase the risk of airborne asbestos fibers.

Professional asbestos abatement helps ensure:

  • Safe work practices

  • Regulatory compliance

  • Proper containment procedures

  • Correct waste handling

  • Appropriate disposal methods

  • Peace of mind during renovation projects

Serving Big Bear Lake & Southern California

Inland Contractors, Inc. proudly provides professional asbestos abatement services throughout:

  • Big Bear Lake

  • Big Bear City

  • San Bernardino Mountains

  • San Bernardino County

  • Inland Empire

  • Los Angeles County

  • Riverside County

  • Orange County

  • Southern California

Our team works with homeowners, commercial property owners, schools, municipalities, contractors, and industrial facilities requiring licensed asbestos removal services.

Need Professional Asbestos Removal?

If your property contains suspect asbestos materials, the first step is obtaining a professional asbestos survey from a qualified third-party consultant. Once asbestos-containing materials have been identified, Inland Contractors, Inc. can safely perform the abatement work in accordance with applicable regulations and industry best practices.

Whether your project involves floor tile, transite pipe, window glazing, roofing materials, pipe insulation, or other asbestos-containing materials, our experienced team is here to help.

Contact Inland Contractors, Inc. today to discuss your asbestos abatement project anywhere in Big Bear Lake, the Inland Empire, or throughout Southern California.

Comments


bottom of page