top of page
Inland Contractors, Inc.
Inland Contractors, Inc.
Trusted asbestos & Lead Abatement since 1997
Trusted asbestos & Lead Abatement since 1997
Asbestos Removal Blog


Behind the Barrier: San Dimas Public Building Asbestos Abatement Project
Inside a San Dimas public building asbestos abatement project involving floor tile, black mastic, drywall, TSI elbows, fireproofing, containment, and detailed cleaning.

Triston Greenawalt
4 days ago7 min read
Â
Â
Â


Big Bear Lake Asbestos Abatement Project Highlight: Safe Removal of Floor Tile, Transite Pipe & Window Glazing
See how Inland Contractors completed a Big Bear Lake asbestos abatement project involving transite pipe, pantry floor tile, and exterior window glazing.

Triston Greenawalt
Jul 143 min read
Â
Â
Â


What Happens Before Asbestos Abatement Starts? The Asbestos Abatement Process in Southern California
Learn what happens before asbestos abatement starts, including survey report review, scope planning, job preparation, containment setup, and safe removal.

Triston Greenawalt
Jul 69 min read
Â
Â
Â


What Is a Procedure 5 in Asbestos Abatement? 🚧 Inland Empire & Southern California Cleanup Guide
Learn what a Procedure 5 is in asbestos abatement, when it may be needed, and how damaged or disturbed asbestos-containing materials are safely handled throughout the Inland Empire, Los Angeles County, Orange County, Riverside County, San Bernardino County, and Southern California.

Triston Greenawalt
Jun 154 min read
Â
Â
Â


What Happens If Asbestos Is Disturbed During Renovation or Demolition?
Learn what to do if asbestos is disturbed during renovation or demolition. This article explains why airborne asbestos fibers are dangerous, when to stop work, why a Certified Asbestos Consultant should perform testing, and how Inland Contractors can help with professional asbestos abatement and removal in Southern California.

Triston Greenawalt
May 263 min read
Â
Â
Â


Project Highlight: Procedure 1 Asbestos Floor Tile and Mastic Abatement in Torrance, CA
This project highlight shows how Inland Contractors completed a Procedure 1 asbestos abatement project at an industrial building in Torrance, CA involving asbestos floor tile removal, asbestos containing mastic, and mapped flooring scope areas.

Triston Greenawalt
Apr 283 min read
Â
Â
Â
bottom of page