top of page
Inland Contractors, Inc.
Inland Contractors, Inc.
Trusted asbestos & Lead Abatement since 1997
Trusted asbestos & Lead Abatement since 1997
Asbestos Removal Blog


Friable vs. Nonfriable Asbestos: What’s the Difference and Why Does It Matter?
What makes asbestos friable or nonfriable? Learn how the two material types differ, common examples, and why condition and planned disturbance matter during asbestos removal.

Triston Greenawalt
15 hours ago5 min read


What Is a Procedure 5? The Road to Asbestos Cleanup Approval in the Inland Empire
A detailed guide to South Coast AQMD Procedure 5 approval, including disturbed asbestos assessment, CAC planning, Rule 1403 submittal, regulatory review, and cleanup.

Triston Greenawalt
Jul 2810 min read


Behind the Barrier: San Dimas Public Building Asbestos Abatement Project
Inside a San Dimas public building asbestos abatement project involving floor tile, black mastic, drywall, TSI elbows, fireproofing, containment, and detailed cleaning.

Triston Greenawalt
Jul 217 min read


Big Bear Lake Asbestos Abatement Project Highlight: Safe Removal of Floor Tile, Transite Pipe & Window Glazing
See how Inland Contractors completed a Big Bear Lake asbestos abatement project involving transite pipe, pantry floor tile, and exterior window glazing.

Triston Greenawalt
Jul 143 min read


What Happens Before Asbestos Abatement Starts? The Asbestos Abatement Process in Southern California
Learn what happens before asbestos abatement starts, including survey report review, scope planning, job preparation, containment setup, and safe removal.

Triston Greenawalt
Jul 69 min read


Project Highlight: Procedure 1 Asbestos Floor Tile and Mastic Abatement in Torrance, CA
This project highlight shows how Inland Contractors completed a Procedure 1 asbestos abatement project at an industrial building in Torrance, CA involving asbestos floor tile removal, asbestos containing mastic, and mapped flooring scope areas.

Triston Greenawalt
Apr 283 min read
bottom of page